For distribution centers, retailers and manufacturers
Your recyclables have a price. Your contract decides how much of it you see.
Baled cardboard, pallets, gaylords, totes and film are sold under rebate and buy-back agreements that read a market index, then take freight, rent, moisture and rejections off it. This site explains every clause from your side of the dock, and works out what a load is really worth.
3. Price
3.1 Buyer shall pay Seller the prevailing market price 60% of the Index Price less $20.00, and not less than $10.00, per ton short ton (2,000 lb) of Material, less freight and handling as incurred with no deduction for freight.
3.2 "Index Price" means the high side of OCC (11), US Southeast, as first published for the month of shipment.
Same load, three contracts
One load of 30 bales at 1,200 lb (18 short tons), no other deductions. The best offer depends on where the index goes. Example index values, not market prices.
| If the index is | Index − $45 | 60% of index − $20 | Flat $35 |
|---|---|---|---|
| $60 / ton | $270 | $288 | $630 |
| $100 / ton | $990 | $720 | $630 |
| $160 / ton | $2,070 | $1,368 | $630 |
The clause map
Fifteen clauses, in the order most agreements use. Three set the price; the rest add to it or take from it.
- § 1 Material and specification
- § 2 Pricing formula
- § 3 Index reference
- § 4 Floor and cap
- § 5 Freight and pickup
- § 6 Baler and equipment
- § 7 Load minimums
- § 8 Contamination and rejection
- § 9 Moisture
- § 10 Weights, tickets and audit
- § 11 Payment terms
- § 12 Title and risk
- § 13 Term and renewal
- § 14 Exclusivity and first refusal
- § 15 Termination and disputes
Real formulas from public contracts
Counties and states publish what private agreements keep confidential. Each one is decoded and can be run in the calculator.
- 1Boulder County, Colorado: tiered fiber rebateP% × OBM SW High − $43.22 per ton, plus a processing fee; P = 50% (499 tons a year or less), 60% (500 to 1,500), 75% (1,501 or more)
- 2Steuben County, New York: bids against "PPW OCC (11) Buffalo High"PPW OCC (11) Buffalo High ± $S per ton
- 3New York State OGS Award 22760: revenue share with a floorR% × max(Recyclable Floor Price, actual sale price)
- 4Kitsap County, Washington: cardboard rebate on a regional indexSplit × Pacific Northwest Secondary Material Pricing index (current month)
- 5Connecticut MIRA and FCR: a 5% contamination threshold in dispute50% × (revenue − $62 per ton processing cost), residue above 5% at the operator’s cost (per the owner’s account)
By the ton or by the piece
Cardboard and film are paid by weight; pallets, gaylords, totes and drums by the unit. The clauses that matter follow from that.
| Baled cardboard (OCC) | Per ton |
|---|---|
| Used wood pallets | Per unit |
| Gaylord boxes | Per unit |
| IBC totes | Per unit |
| Steel, plastic and fiber drums | Per unit |
| Stretch film (LDPE wrap) | Per ton |
When you want offers
One request, passed to buyers who bid on your material.
- Describe the material. What it is, how much each month, bale weight or counts, and the pickup site.
- Buyers bid. Your request is passed to buyers who bid on that material, and they contact you.
- Compare on net value. Put the offers in the comparer and check the terms against the term sheet before you sign.
Short answers
- How is a cardboard rebate calculated?
- Usually an index value for your region and month, adjusted by a spread or a percentage, less freight, equipment and quality deductions, multiplied by your net tons.
- What is the OCC index?
- Most US contracts cite Fastmarkets RISI’s monthly OCC (11) assessment: a price range by region, FOB seller’s dock, in dollars per short ton.
- What is a floor price?
- A minimum price per ton the buyer pays even when the formula comes out lower.
- Can a rebate go negative?
- Yes, if freight, equipment or deductions exceed what the formula pays and there is no floor.
- What is a short ton?
- 2,000 lb. A long or gross ton is 2,240 lb, and some contracts define a gross ton as 2,200 lb.
- Who weighs the load?
- Usually the buyer’s scale. The contract should require a scale ticket for every load and give you a right to audit.
- Should I sign an exclusive?
- Only if the price reflects it: an index link, a floor, audit rights and a short exit, limited to the materials and sites actually priced.
- Does this site buy recyclables?
- No. It explains contracts and does arithmetic. A bid request is passed to buyers who bid on the material.