Glossary

The words in a recycling contract

30 terms you will meet in rebate and buy-back agreements, each with a link to the clause where it matters.

Updated October 28, 2026

Audit right
A contract right to inspect the buyer’s records for your material, such as scale tickets and sale prices.More.
Bale
A compressed, tied block of material made by a baler. Cardboard bales are sold by weight; mills set minimum and target bale weights.More.
Buy-back
An arrangement where a buyer purchases used items, such as pallets, gaylord boxes or totes, back from the business that used them, usually per unit.
Cap
The highest price per ton the buyer will pay, whatever the formula says.More.
Core
A broken or damaged pallet bought for repair or for parts.More.
Cull
An item rejected during sorting, such as a pallet or box that does not make any paid grade.
Deduction
A fixed amount per ton subtracted after a percentage of the index is applied, as in "60% of index minus $20".More.
Downgrade
Paying a load at a lower grade’s price because it missed the specification.More.
Evergreen clause
A clause that renews an agreement automatically for another term unless notice is given in a set window.More.
Exclusivity
A commitment to sell all of a material, or all material from some sites, to one buyer.More.
Floor price
The lowest price per ton the buyer will pay, whatever the formula says.More.
FOB (free on board)
The point at which the buyer takes over the goods and the freight. The main US OCC index is assessed FOB seller’s dock.More.
Gross ton
Usually 2,240 lb (a long ton). Some contracts define it as 2,200 lb. Always check the contract’s definition.More.
High side
The top of a published price range. Contracts state whether they use the high, low or midpoint.More.
Index
A published price assessment, such as Fastmarkets RISI’s monthly OCC (11) range by region, that a contract formula reads each month.More.
Indexed transaction
A sale whose price is set entirely by a formula on a published price. Fastmarkets excludes these when assessing the index.More.
Light-load charge
A charge for a pickup below the agreed minimum weight or count.More.
Matching right
The buyer’s right to keep your business by matching a better written offer from someone else.More.
Moisture deduction
Weight or money taken off a load because measured moisture exceeded the contract limit.More.
OCC
Old corrugated containers: used cardboard boxes. OCC #11 is the standard grade in the ReMA Scrap Specifications Circular.More.
Offtake agreement
An agreement under which a buyer commits to take a supplier’s output, here a generator’s recyclables, on set terms for a period.
Outthrows
Papers that make a bale unsuitable for use as the grade specified, such as boxboard mixed into OCC.More.
Prohibitive materials
Material that, above the allowed amount, makes a bale unusable as the grade specified, or that could damage equipment: plastic, metal, wood, glass, waxed board.More.
Rebate
Money paid (or credited) to the generator for its recyclables, usually per ton under a formula.
Revenue share
A percentage of what the buyer earns from selling your material, sometimes with a floor.More.
Scale ticket
The weighbridge record for one load: gross, tare and net weight, with date and load number.More.
Short ton
2,000 lb, the unit of the main US OCC index.More.
Spread
A fixed amount per ton added to or taken from the index, as in "index minus $25".More.
Tare
The weight of the empty trailer or container, subtracted from gross weight to give net weight.
Title
Ownership of the material. The contract says when it passes to the buyer.More.